Work continues on the generator for the Pulaski County Health Department.
Pulaski County Maintenance Director Jeff Johnston told the county council this week that the electrician is working on obtaining a small transformer to change the voltage for the generator. A gas line also needs to be ran in order for the generator to be fully operational.
Johnston said the generator work should be complete by next week.
The health department obtained the generator so vaccines can be properly refrigerated if the power happens to go out in the building. Two computers would also be powered if electric is lost at the annex.