Severe Winter Storm is Over, But Watch for Potholes

Starke County Highway Superintendent Stephen "Rik" Ritzler
Starke County Highway Superintendent Stephen “Rik” Ritzler
INDOT is urging drivers in Northwest Indiana to be on alert for potholes on interstates, U.S. highways, and state routes after the fluctuating temperatures following last week’s severe winter weather has caused numerous potholes to form quickly. As temperatures continue to rise and fall through the winter season, more potholes are likely to form.

INDOT said in a press release, “When the Indiana Department of Transportation is not clearing snow, ice or storm debris, crews are focused on maintaining and preserving the state’s roads and bridges, which mainly consists of pothole patching in the winter months.”

Continue reading →

INDOT Crews Continue to Clear Roadways

 
 
INDOT crews have been applying several solutions to hard-packed snow in an attempt to improve road conditions.

INDOT Spokesman Matt Deitchley said salt, chemical de-icers and abrasives were put down yesterday. In addition, crews are using plows and heavy duty equipment to break the snow apart. Deitchely stresses that road conditions may get worse before they get better.

Continue reading →

Most Roads Open, INDOT Still Urges Caution

 
 

Most roads across Northwest Indiana are now passable. However, it’s still too cold for road salt to be effective, so a sheet of ice should be expected on all roads across northwest Indiana. Conditions may get worse overnight when any thawing and melting that has occurred during the day may refreeze. Deichley adds icy conditions likely won’t improve until later in the day tomorrow when temperatures are expected to become more favorable for chemical melting agents and plows to achieve optimal results. Until then, INDOT is asking the public to refrain from any non-emergency travel. Those who must travel are asked to be prepared for these conditions before leaving and to adjust driving behaviors in order to arrive at destinations safely. Take it slow, leave plenty of room between vehicles and give plows ample space to work.

Cold and Wind Hamper INDOT’s Efforts to Clear Roads

 INDOT snow plow drivers are fighting a losing battle with Mother Nature as they try to clear snow from the roads. They advise blowing and drifting snow has intensified and icy conditions persist on nearly all roadways. All roads should be considered extremely slick and hazardous, and motorists are discouraged from driving in non-emergency situations.

The sub-zero temperatures are wreaking havoc on plow trucks and other heavy machinery, and this is forcing repairs in the midst of plow routes. Roads are also drifting shut soon after they are cleared by plows, and abandoned vehicles on some roadways are making it impossible to clear them. Additionally, road salt is less effective in these frigid temperatures, making it very difficult to remove hard-pack snow and ice without a spike in temperatures. INDOT officials stress that motorist safety is their primary concern when they ask people to stay off the roads. If you insist on being out, take it slow and carry a charged cell phone and emergency kit in your car. Remember, these road conditions are slowing response times for police, firefighters, EMTS and tow trucks. Frostbite and hypothermia can develop very quickly on exposed skin, and you may freeze to death before help arrives.

 

U.S. 35 Bridge Project Nearing Completion

 
 
Work on the U.S. 35 bridge is coming to a close.

Indiana Department of Transportation spokesman Matt Deitchley stated that it could be next week before the bridge is open to traffic. The final surface of the roadway, lane striping and median work is left. If the weather cooperates, the opening could occur a little sooner than anticipated.

The weather was the reason why the project was pushed back from its original completion date in November.

Deitchley will notify WKVI when the crews are nearing the time when the bridge will be open. The bridge has been closed since June.

Two Bridge Projects Still on Track, Says INDOT Representative

 
 
Two construction projects in the area are moving along, according to an INDOT representative who said the U.S. 6 bridge work south of LaPorte and the bridge work on U.S. 35 south of U.S. 30 are moving along, still on track to be completed in November.

Matt Deitchley, media relations director for INDOT, told WKVI that the U.S. 6 bridge work is progressing and crews are working on the walls to strengthen the support of the bridge and the piers. Continue reading →

INDOT Reopens State Road 39 north of U.S. 30

 
 
A highway in LaPorte County is open again after being closed to repair a railroad crossing. State Road 39 between U.S. 30 and U.S. 6 reopened this week. The road was closed so repairs could be made to a railroad crossing. INDOT officials say the work wrapped up ahead of schedule, so the road has been reopened to through traffic.

INDOT Announces Three-Day Closure of State Road 331 South of Bremen

 
 
INDOT has announced the closure of another road, this time State Road 331 between State Road 106 near Bremen and U.S. 30, beginning Monday, Sept. 9 until Wednesday, Sept. 11. Crews will be performing a chip seal and fog seal operation in an effort to preserve the road surface, and like all projects of this nature, the work is dependent on dry weather and may be delayed if conditions aren’t ideal.

Continue reading →

Road Construction Projects to Cease for Labor Day Holiday

 
 

A work moratorium on road construction will be in effect for the Labor Day weekend.

The Indiana Department of Transportation will remove road restrictions to ease traffic flow for an anticipated traffic increase. Some closures and restrictions will remain on larger projects, including the U.S. 35 bridge project just south of the U.S. 30 interchange in Starke County and the U.S. 6 bridge project which is two miles east of U.S. 35 in LaPorte County.

The moratorium will begin Friday, Aug. 30 in the afternoon and normal construction will resume in the morning hours of Tuesday, Sept. 3.

Lane Restictions Begin Today on U.S. 31 in Marshall County

 
 
Indiana Department of Transportation (INDOT) crews are working on the new U.S. 31 project and beginning today lane restrictions on U.S. 31, just north of the Yellow River Bridge in Marshall County, will be in effect.

U.S. 31 will be down to one lane in each direction for a short stretch. This restriction will be in place until Monday, Aug. 19.

INDOT reminds you to use caution and consider worker safety when driving through a construction zone.

U.S. 35 Bridge Project on Schedule

 
 
The old bridge just south of the U.S. 30 and U.S. 35 interchange just west of Hamlet has been removed and crews are now pile driving the area and getting it ready for a new bridge structure.

INDOT spokesperson Matt Deitchley stated that the project is extensive with the approximate completion date in November. The new bridge will be erected over existing railroad tracks which requires extra attention.

Continue reading →

INDOT to Close State Road 110 Today, Monday

 
 
The closure of State Road 110 has been delayed a bit, but INDOT has announced that the road will be closed today and Monday between state roads 17 and 117 as crews perform a chip seal and fog seal operation to preserve the road surface. SR 110 along this stretch will be closed Friday for the chip seal, the roadway will be swept that late afternoon/evening, and reopened for the weekend. On Monday crews will close the road again to complete the fog seal. This project is dependent on dry weather and may be delayed if conditions aren’t ideal.

Continue reading →

INDOT Announces Road Closure in Starke and Marshall Counties

 
 
Motorists traveling between Bass Lake and Culver will need to seek an alternate route for the next couple of days. INDOT plans to close State Road 10 between state roads 23 and 17 in Starke and Marshall Counties Wednesday and Thursday, weather permitting for chip and fog seal repairs. INDOT’s marked detour will use State Road 8 to get around the closure. The work will only occur if it does not rain. The chip and fog sealing process is designed to extend the life of the pavement. INDOT officials say crews are trying to get as much done as possible before school starts so as not to disrupt bus routes.

INDOT Schedules Road Closure For State Road 110

 
 
Monday’s rain delayed INDOT’s scheduled chip and fog sealing of State Road 110 east of U.S. 31. The work is now scheduled to start Tuesday and wrap up Wednesday. INDOT’s marked detour will utilize U.S. 31 and State Roads 10 and 331 to get around the closure. Chip and fog seal repairs are performed in order to extend the life of the pavement. INDOT officials are trying to complete as many projects as possible before school resumes in order to minimize disruption of bus routes.