The Qualified School Construction Bond project continues at Knox High School. Recently the water pipes were replaced and the pool was redone. At the time the bids were accepted on those projects, some alternative bids were put out too.
One of the bids was to replace student lockers and Superintendent A.J. Gappa talks about the second bid. Continue reading